Site Logo E-PROJECTTOPICS

DESIGN, CONSTRUCTION AND TESTING OF AN IMPROVED CASTING POURING LADLE


📝


Presented To


Engineering Department

📄 Pages: 86       🧠 Words: 12281       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 437      

⬇️ Download (Complete Report) Now!

ABSTRACT
A ladle is a foundry tool or equipment specially designed to pour molten metal into a prepared mould. The pouring rate or consistency is one of the factors that may lead to a defect in a cast. To avoid casting defects (cold shut and misrun) associated with pouring, there is need for the design of a suitable pouring ladle that will reduce the time to be spent in crucible lifting, to pouring the molten metal from the crucible to fill the mould at consistent rate. In this research, a pouring ladlemachine of 50 kg molten Aluminium alloy was successfully designed, constructed and tested. The result of this research showed that the total time spent in lifting the crucible containing molten Aluminium alloy from the furnace to filling the mouldusing the pouring ladle was 53.48 sec while when using the hand-shank ladle was 81.80 sec. The speed of pouring when using the pouring ladle machine and hand-shank ladle were 0.42cm/s, 0.43cm/s respectively.The micrograph of both samples show visible well defined coarse grains. This could be due to the even distribution of the constituents as cooling takes place since no too much time was taken to pour the liquid metal into the mould. The result of the XRF tests shows the presence of the various elements detected in the alloy with their percentages at different energy level with the high percentage of Silicon detected. Thedesigned ladle machinewas able to give casts with no cold shut and misruns cast defects with less time spent and fatigue during pouring.There was time difference of 28.32 sec (34.62 % time saving) and speed difference of 0.01 cm/s (2.33 % speed increase).

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 86       🧠 Words: 12281       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 437      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

IMPROVED MODELLING OF HARMATTAN DUST EFFECT ON THE CROSS POLARIZATION OF A MICROWAVE ACCESS RADIO LINK OPERATING BETWEEN 15GHz AND 38GHz BY HENRY AIKHIONBARE DESIGN, CONSTRUCTION AND TESTING OF AN OUTWARD RADIAL-FLOW REACTION WATER TURBINE APPLICATION OF FUZZY C-MEANS CLUSTERING AND PARTICLE SWARM OPTIMIZATIONTO IMPROVE VOICE TRAFFIC FORECASTINGIN FUZZY TIME SERIES THE EFFECT OF INTERVAL LENGTH AND MODEL BASIS ON FUZZY TIME SERIES ELECTRIC LOAD FORECASTING DEVELOPMENT OF AN IMPROVED APPLICATION SPECIFIC TUNELLING PROTOCOL SELECTION SCHEME FOR SITE TO SITE VIRTUAL PRIVATE NETWORKS DEVELOPMENT OF AN IMPROVED SECURITY AIDED AND GROUP ENCOUNTER PROPHET ROUTING PROTOCOL OF AN OPPORTUNISTIC NETWORK MODIFICATION AND PERFORMANCE EVALUATION OF AN IMPROVED SOYABEAN THRESHER DEVELOPMENT OF A STATE ESTIMATION BASED IMPROVED DETECTION AND LOCALIZATION OF NON-TECHNICAL LOSSES USING SMART METER MEASUREMENTS DEVELOPMENT OF AN IMPROVED MULTI-HOP ROUTING PROTOCOL IN WIRELESS SENSOR NETWORKS BASED ON CLUSTER HEAD LOAD BALANCING TECHNIQUE DEVELOPMENT OF AN IMPROVED SHORT-TERM PEAK LOAD FORECASTING MODEL BASED ON SEASONAL AUTOREGRESSIVE INTEGRATED MOVING AVERAGE AND NONLINEAR AUTOREGRESSIVE NEURAL NETWORK FOR NIGERIA POWER SYSTEM GRID DEVELOPMENT OF AN IMPROVED CULTURAL ARTIFICIAL FISH SWARM ALGORITHM WITH CROSSOVER DEVELOPMENT OF AN IMPROVED INTRUSION DETECTION BASED SECURED ROBUST HEADER COMPRESSION TECHNIQUE EVALUATION OF LABOUR-BASED TECHNIQUE FOR CONSTRUCTION OF SMALL EARTH DAMS DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF AN AXIAL-FLOW MILLET THRESHER DESIGN AND CONSTRUCTION OF A LIGHT ACTIVATED REMOTE CONTROLLED FAN REGULATOR DESIGN,CONSTRUCTION AND EXPERIMENTAL EVALUATION OFTHEPRODUCTSOF A LOW COST BRIQUETTE MACHINE FOR RURAL COMMUNITIES IN NIGERIA DEVELOPMENT AND ANALYSIS OF AN IMPROVED PV-ARRAY MODEL WITH SHADING EFFECTS IMPROVED DESIGN AND PERFORMANCE ANALYSIS OF SIMILAR POLE RATIO DUAL STATOR WINDINGS FOR SIX PHASE INDUCTION MACHINES STATE-SPACE DESIGN AND CONSTRUCTION OF A MAGNETIC SUSPENSION SYSTEM DESIGN AND CONSTRUCTION OF ELECTRONICS SECURITY ASSISTANT

click on whatsapp