Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF THE PERFORMANCE AND MAINTENANCE CULTURE OF THE AHMADU BELLO UNIVERSITY, SAMARU, ZARIA WATER TREATMENT PLANT


📝


Presented To


Engineering Department

📄 Pages: 94       🧠 Words: 11364       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 467      

⬇️ Download (Complete Report) Now!

ABSTRACT
The project An Assessment of the Performance and Maintenance Culture of Ahmadu Bello University, Samaru, Zaria, Water Treatment Plant aimed at assessing the performance and the maintenance culture of the Ahmadu Bello University Water Treatment Plant (ABU WTP).The technique of survey method, monitoring of treatment process and questionnaires were used to obtain and process the required data. Therefore, each treatment unit was visited and critically examined, treatment processes monitored, leakages along the distribution network monitored for five weeks; and base on this approach, some performance indicators (PIs) were selected and their values were computed and compared with known standards. It was observed that the pump efficiency was 76% which is acceptable. About 1150.2 liters (303.9 gallons) that is 0.024% of water loss as a result of leakage along the pipeline within five weeks. The workability of the plant units was 85%, the availability of power at the plant was 95.83% and the average daily time of power supply is found to be 22 hours. The plant uses chlorine as disinfectant and this is acceptable by World Health Organization (WHO).The materials used for the Tanks and Reservoir is of International Standard (Concrete and Block). The maintenance culture predominant in the plant is preventive maintenance. The automatic dosing machine at the plant was unserviceable, hence dosing is done manually, this is not acceptable by international standard. The overall performance of the treatment plant was found to be 50%; this performance is very low comparing to the assessment criteria.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 94       🧠 Words: 11364       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 467      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

OPTIMUM PERFORMANCE OF A BATTERY OF WELLS USING A CCMPUTER SIMULATION MODEL ESTIMATION OF STREAMFLOW IN THE UPPER BENUE RIVER BASIN USING CLIMATIC WATER BUDGET METHOD EVALUATING SERVICE DELIVERY PERFORMANCE OF WATER UTILITIES IN KADUNA STATE WATER BOARD PERFORMANCE EVALUATION OF WUPA SEWAGE TREATMENT PLANT DEVELOPMENT OF A FOUR-ROW TRACTOR MOUNTED SOYBEAN PLANTER MODELLING OPTIMAL WATER RESOURCES ALLOCATION IN TIGA DAM ELIMINATING SPEED CONSTRAINTS ALONG KADUNA-ZARIA RAILWAY LINK ASSESSMENT OF OIL EXTRACTS FROM TIGER NUT(Cyperus esculentus), WATER MELON (Citrullus vulgaris) and NEEM SEEDS (Azadirachta indica) AS CUTTING FLUIDS IN DRILLING OPERATION OF MILD STEEL MODELLING OF WATER QUALITY DETERIORATION IN THE DISTRIBUTION NETWORK OF KADUNA METROPOLIS USING MATLAB ASSESSMENT OF TRANSIENT STABILITY ENHANCEMENT CAPABILITY OF UNIFIED POWER FLOW CONTROLLER IN A MULTI-MACHINE POWER SYSTEM Estimation and Characteristics of Fluvial Sediment Deposits into Kubanni Reservoir, Zaria OPTIMIZATION OF ACTIVATED CARBON PREPARATION FROM CORNCOB WASTEWATER TREATMENT ASSESSMENT OF GROUNDWATER POTENTIAL FOR RURAL WATER SUPPLY SCHEME USING GEOGRAPHIC INFORMATION SYSTEM (GIS) IN EDE NORTH LGA OF OSUN STATE NIGERIA DEVELOPMENT AND PERFORMANCE EVALUATION OF AN AGITATED QUENCHING TANK/BATH RELIABILITY ASSESSMENT OF RC CONTINUOUS BEAM DESIGNED TO BS 8110 (1985) CRITERIA COMPARATIVE STUDY OF THE PERFORMANCE OF MIMO EQUALIZERS FOR WIRELESS COMMUNICATION RECEIVERS ASSESSMENT OF THE IMPACT IMPACT OF CLIMATE CHANGE ON WATER RESOURCES AVAILABILITY IN THE SOKOTO-RIMA RIVER BASIN ASSESSMENT OF DUMPSITE IMPACT ON SOIL AND GROUNDWATER QUALITY IN TUDUN WADA ASSESSMENT OF GROUNDWATER POTENTIAL ZONES IN OKEERO LGA OF KWARA STATE NIGERIA USING GIS-BASED INTEGRATED APPROACH PAVEMENT FAILURE INVESTIGATION ALONG ZARIA - FUNTUA ROAD

click on whatsapp