Site Logo E-PROJECTTOPICS

3-D READJUSTMENT OF PARTS OF THE NIGERIAN PRIMARY TRIANGULATION NETWORK WITH GNSS DATA


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 90       🧠 Words: 12888       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 457      

⬇️ Download (Complete Report) Now!

ABSTRACT
Current development has shown many countries improving and strengthening their national control networks using modern space geodetic system. This study carried out 3D readjustment of part of the Nigerian Primary Triangulation Network using GNSS data obtained from Office of the Surveyor General of the Federation (OSGoF). First, the geometric analysis of the existing Nigerian Primary Network were evaluated using Triangle Inequality theorem and on how well the triangles in the network are conditioned. The result revealed that the network fulfilled the condition of the theorem however, when subjected to how well-conditioned the triangles were within the network, it was discovered that 56% of the triangles met the requirement while 44% did not meet the geometric conditionality. Different processing strategies are capable of giving different coordinate solutions for same point. Using fifty-two (52) GNSS station observational campaigns carried out within the period of October, 2010 - April, 2011, the study performed comparative evaluation of three different GNSS post-processing strategies with respect to points of reference originally processed with BERNESSE software from OSGoF. These processing strategies include; reducing observational campaign observed from pairs of stations (baselines) and combining these baselines into a network (Approach 1), taking GPS observations observed simultaneously at all stations directly into a network adjustment where all the coordinates of the network are presents as unknowns (Approach 2) and lastly, processing the observations using Precise point Positioning techniques (Approach 3). Due to the dissimilar nature of positioning, Trimble Total Control software was used to process Approach 1 and 2 solution (Relative solution approach) while GNSS-lab tool (gLAB) was used to process Approach 3 (Stand-alone solution approach). The residual (differences) in the horizontal and vertical component were computed for all observations. Out of the three solutions, Approach 3 gave solutions that were closest to the points of reference, followed by Approach 1 and then Approach 2. Poor performance of Approach 2 was attributed to some restraining factors that considerably induced errors within its solutions. Improvement on the study will be on how to develop a standard approach for harmonizing GNSS solutions in the near future.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 90       🧠 Words: 12888       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 457      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

AN ASSESSMENT OF THE CONSTRAINTS TO UNIVERSITY - INDUSTRY COLLABORATION (UIC) INNIGERIAN CONSTRUCTION SECTOR AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY AN EVALUATION OF ART EDUCATION PROGRAMMES IN SOME SELECTED POST-PRIMARY SCHOOLS DAYLIGHT PERFORMANCE AND OPTIMIZATION WITH LIGHT PIPE IN THE DESIGN OF MODERN ART MUSEUM ABUJA A STUDY OF THE RELATIONSHIP BETWEEN GENDER AND PREFERRED CONTENT IN PUPIL'S DRAWING AMONG SELECTED PRIMARY SCHOOL PUPILS EVALUATION OF UNDERGRADUATE SCULPTURE CURRICULUM IN SELECTED NIGERIAN UNIVERSITIES AN EVALUATION OF HOME AND SCHOOL ENVIRONMENTS ON THE ARTISTIC CREATIVITY OF PRIMARY SCHOOL CHILDREN AN APPRAISAL OF CONSTRUCTION PROJECT PLANNING IN NIGERIAN INDIGENOUS CONSTRUCTION COMPANIES COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY PERFORMANCE EVALUATION OF PRIMARY HEALTH CARE (PHC) BUILDINGS IN THE FEDERAL CAPITAL TERRITORY (FCT) TOTAL ELECTRON CONTENT ESTIMATION AND ANALYSIS OVER THE NIGERIAN GLOBAL NAVIGATION SATELLITE SYSTEM PERMANENT REFERENCE NETWORK THE EFFECTS OF THE ACCURACY OF NUMERICAL RELATIVE ORIENTATION OF AEROTRIANGULATION BY INDEPENDENT MODELS An Investigation into the conditions of contract with regards to claims in some selected building projects ASSESSMENT OF GRAPHIC DESIGN CURRICULAR OF NIGERIAN UNIVERSITIES IN RELATION TO DIGITAL CHALLENGES FACED BY FRESH GRADUATES IN THE PRINTING INDUSTRY NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS COMPLEX ABUJA AN ATTEMPT TOWARDS EXPRESSING REGIONAL ARCHITECTURE AN APPRAISAL OF THE CAREER EXPERIENCES OF PROFESSIONAL WOMEN IN THE NIGERIAN CONSTRUCTION INDUSTRY MODIFICATION OF NIGERIAN TRADITIONAL MEN’S HORIZONTAL LOOM TO ENHANCE PRODUCTIVITY OF THE NARROW BAND FABRIC NIGERIAN CURATORSHIP AND THE EXHIBITION OF CONTEMPORARY AFRICAN ART WORKS REDEVELOPMENT PROPOSAL FOR THE NATIONAL MUSEUM KADUNA THE APPLICATION OF INDIGENOUS NIGERIAN ARCHITECTURAL ELEMENTS IN CONTEMPORARY MUSEUM ARCHITECTURE EVALUATION OF THE PROPERTIES OF METAKAOLIN BASED GEOPOLYMER CONCRETE MADE WITH RECYCLED CONCRETE AGGREGATE

click on whatsapp