Site Logo E-PROJECTTOPICS

DEVELOPMENT OF PUBLIC PROCUREMENT STRATEGY FOR THE PROVISION OF POTABLE WATER INFRASTRUCTURE TO LOW INCOME URBAN AREAS (LIUAs)

(A CASE STUDY OF NIGERIA)


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 100       🧠 Words: 7016       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 126      

⬇️ Download (Complete Report) Now!

ABSTRACT
The successful public procurement of infrastructure is an essential element in the achievement of sustainable development. This success is dependent on the procurement strategy adopted. The ability of a procurement strategy to achieve the project objectives is based on the strategy being specifically tailor made to the infrastructure type and the context of the procurement. Research has shown that water is a key element in achieving the Sustainable Development Goals because it plays a part in achieving fourteen of the seventeen goals. With the majority of the world's poor living in urban areas with limited access to clean drinking water. Its infrastructure is clearly the most essential. Nigeria has the fourth largest low income urban population. These limited resources that Nigeria has to effectively utilise them to provide this essential service and provide sustainable development for its citizenry. The study was aimed at developing a public procurement strategy for the provision of potable water infrastructure to low income urban areas in Nigeria. The Research carried out was the case studies of water infrastructure procured for the Millennium Development Goals Nigeria for MDG Goal 7 in Kaduna, Anambra and Ogun states. The research population was made up of three key components; the contractors, the clients and the communities. The client and contractors were interviewed to ascertain the effectiveness of the existing strategy in terms of achieving their project goals, critically analyse the strategy and propose improvements. The communities participated in the focus group to ascertain their assessment of the existing strategy, their role in the process and propose improvement. The research found that only one public strategy was identified to be used by the Client Organisation which was based on competitive tendering and the traditional procurement process. Although it had some advantages such as competition, it did not achieve both the primary and secondary goals of the procurement process and hence was deemed ineffective. Some of the limitations identified of the current strategy included; political interference, lack of community involvement, inadequate design, transparency, no feedback mechanism, sustainability and maintenance issues .Consequently, a strategy framework was developed after a critical analysis of the problems and the context in which they emerge, and the various possible solutions to the problems were identified and evaluated. The developed strategy framework which consisted of the five stages (need definition, design, tendering, construction and operation) and three resource assessment gateways. The framework inculcated the importance of defined primary and secondary project objectives, a clear and distinct role for the community and other stakeholders, effective risk distribution, and provided a more holistic flexible sustainable strategy that could be implemented for immediate use under current laws or the planned reform. The study recommends that when developing an effective procurement strategy, achieving all specific goals of key stakeholders and an effective community and stakeholder management system should be given priority.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 100       🧠 Words: 7016       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 126      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY PLANNING FOR THE URBAN INFORMAL SECTOR IN ABUJA CITY AN ASSESSMENT OF ACCESS TO FINANCE FOR HOUSING DEVELOPMENT ASSESSMENT OF URBAN BUS SERVICES IN MINNA NIGER STATE THE CONTRIBUTIONS OF NIGERIAN ARTISTS AND ART EDUCATORS TO THE DEVELOPMENT OF ART EDUCATION IN NIGERIA URBAN MANAGEMENT IMPLICATIONS OF PERI URBAN GROWTH GEOSPATIAL MAPPING OF WATER DISTRIBUTION SYSTEM AVAILABILITY OF BOREHOLE SYSTEMS FOR POTABLE WATER SUPPLY DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS APPLICATION OF GREEN ARCHITECTURE PRINCIPLES TO WATERFRONT DESIGN AN ASSESSMENT OF THE PROVISION OF INFRASTRUCTURE UNDER THE PUBLIC PRIVATE PARTNERSHIP HOUSING SCHEME IN ABUJA AN ARCHITECTURAL RESPONSE TO INTEGRATING USER FACILITIES IN THE PROPOSED REDEVELOPMENT OF JOS RAILWAY TERMINUS IMPLEMENTING THE 1992 URBAN AND REGIONAL PLANNING LAW ANALYSIS OF POVERTY IN ZARIA URBAN AREA AND THE URBAN MANAGEMENT IMPLICATIONS DEVELOPMENT OF GROGGED CERAMIC CLAY ROOFING TILES FOR POULTRY HOUSING AS AN ALTERNATIVE TO ZINC SHEETS A STUDY OF CONTEMPORARY PUBLIC OUTDOOR SCULPTURES IN FOUR SELECTED STATES IN WESTERN NIGERIA ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIAN CONSTRUCTION INDUSTRY KADA LODGE - A COMPLEMENTARY DEVELOPMENT FOR HASSAN KATS1NA MEMORIAL PARK, KADUNA A REDEVELOPMENT PROPOSAL FOR VOM GENERAL HOSPITAL

click on whatsapp