MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 84       🧠 Words: 12412       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 313      

⬇️ Download (Complete Report) Now!

ABSTRACT
Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal distribution of errors and a low R2 value obtained when multiple linear regression analysis was first conducted, the study's data set was double log transformed and then partitioned/reclassified to account for public and private sector projects. Three models were developed following the multiple linear regression analysis repeated after transforming and partitioning/reclassifying the study's data set. Two of these models (the public sector model and the private sector model) had high R2 values and were found after testing and validation, to be suitable for predicting construction time, while one of the models (the all projects model) had a low R2 value and was consequently found to be unsuitable for predicting construction time. The models with high R2 values serve as a useful tool to project managers and contractors for predicting construction time, thereby facilitating effective planning.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 84       🧠 Words: 12412       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 313      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSOCIATION OF NIGERIAN AUTHORS' VILLAGE, KURRA FALLS. "ARCHITECTURE AS AN INSPIRATION FOR CREATIVE WRITING AN EXPRESSION OF IMAGERY IN COURT BUILDINGS CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY ASSESSMENT OF PROFESSIONAL'S PERCEPTION OF KNOWLEDGE AND SKILLS REQUIREMENT OF CONTRACTORS FOR MASS HOUSING CONSTRUCTION AN ASSESSMENT OF SITE LAYOUT PRACTICES OF SOME CONSTRUCTION FIRMS DEVELOPING FACTOR-BASED MODELS FOR MEASURING AND PREDICTING HAZARD RECOGNITION CAPABILITY OF CONSTRUCTIONWORKERS AN APPRAISAL OF THE CAREER EXPERIENCES OF PROFESSIONAL WOMEN IN THE NIGERIAN CONSTRUCTION INDUSTRY PERFORMANCE EVALUATION OF PRIMARY HEALTH CARE (PHC) BUILDINGS IN THE FEDERAL CAPITAL TERRITORY (FCT) EVALUATING THE INFLUENCE OF ARCHITECTURAL CHARACTER ON INMATES IN THE DESIGN OF PRISONS IN NIGERIA AN APPRAISAL OF PREQUALIFICATION CRITERIA USED FOR CONTRACTORS SELECTION IN PUBLIC BUILDING PROJECTS IN NIGERIA EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES MODIFICATION OF NIGERIAN TRADITIONAL MEN’S HORIZONTAL LOOM TO ENHANCE PRODUCTIVITY OF THE NARROW BAND FABRIC THE SUITABILITY OF HUSKSCRETE BLOCKS AS CONSTRUCTION UNITS AN APPRAISAL OF SOFT SKILLS REQUIRED FOR SUCCESSFUL PROJECT MANAGEMENT OF CONSTRUCTION PROJECTS PLANNING AND CONTROL MODEL FOR THE CONSTRUCTION OF A LARGE IRRIGATION PROJECT EVALUATING LESSONS LEARNED PRACTICES (LLPs) IN PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS IN NIGERIA 3-D READJUSTMENT OF PARTS OF THE NIGERIAN PRIMARY TRIANGULATION NETWORK WITH GNSS DATA DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY A SURVEY OF CONCRETE PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT

click on whatsapp