AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 99       🧠 Words: 10992       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 121      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 99       🧠 Words: 10992       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 121      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS ASSESSMENT OF ERGONOMIC ADAPTABILITY PRACTICES AMONG SELECTED CONSTRUCTION CRAFTSMEN An Investigation into the conditions of contract with regards to claims in some selected building projects AN APPRAISAL OF THE CRITICAL SUCCESS FACTORS OF PROJECT PARTNERING TOWARDS ITS ADOPTION IN THE NIGERIAN CONSTRUCTION INDUSTRY CONTEXTUALISATION OF POTHOLES ON NIGERIAN ROADS IN PAINTING KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL ASSESSMENT OF THE IMPLEMENTATION OF ABUJA TOURISM DEVELOPMENT MASTER PLAN (2000 – 2010) MEASUREMENT OF ARTISTIC CREATIVE ABILITIES AMONG SOME SELECTED POST-PRIMARY STUDENTS IN GONGOLA STATE AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS Assessment of the Impact of Contraventions of Building Regulations on the Architecture of Mixed Landuse Areas of Kano Metropolis DEVELOPMENT OF WOOD FIRING KILN IN TERTIARY INSTITUTIONS IN NIGERIA ASSESSMENT OF RESIDENTS’ PARTICIPATION IN OUTDOOR RECREATION IN NASSARAWA LOCAL GOVERNMENT AREA ASSESSMENT OF THE ACTIVITIES OF ABUJA GEOGRAPHIC INFORMATION SYSTEM (AGIS) CREDIT FACILITIES IN THE FINANCIAL INSTITUTIONS FOR FINANCING CONSTRUCTION PROJECTS IN NIGERIA ASSESSMENT OF URBAN DEVELOPMENT ACTIVITIES OF COMMUNITY BASED ORGANIZATIONS A FUSION OF NIGERIA’S REGIONAL ARCHITECTURAL STYLES IN THE DESIGN OF PROPOSED NATIONAL ARTS AND HISTORY MUSEUM COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY AN ASSESSMENT OF THE PROPERTIES OF CONCRETE MADE WITH CERAMIC WASTE AS AGGREGATE AN ASSESSMENT OF ACCESS TO FINANCE FOR HOUSING DEVELOPMENT GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA

click on whatsapp