Site Logo E-PROJECTTOPICS

ASSESSMENT OF GROUNDWATER POTENTIAL FOR RURAL WATER SUPPLY SCHEME USING GEOGRAPHIC INFORMATION SYSTEM (GIS) IN EDE NORTH LGA OF OSUN STATE NIGERIA


📝


Presented To


Engineering Department

📄 Pages: 89       🧠 Words: 11927       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 478      

⬇️ Download (Complete Report) Now!

ABSTRACT
Groundwater serves as a primary source of water supply in rural areas of Ede North Local Government Area (LGA) of Osun State, Nigeria. However, low access to drinking water coupled with pollution due to agricultural practices has been common problems in this LGA.This research was aimed at assessing the groundwater resourcesstatus of Ede North LGAusing Geographic Information System (GIS). Key hydrological and climatic parameters, most of which were acquired from Landsat 7 (ETM), ASTER were digitalized in GIS environment. The respective parameters were assigned weightages and their attributerangedand ranked with reference to groundwater occurrences or pollution potential. The resulting GIS layers were overlain using overlay function of ArcGIS and further integrated one over the other using GIS add function. Finally the study area was classified into three different groundwater potential zones. Over 82km2out of 112km2of the study area was classified as high and moderately groundwater potential zones. The groundwater of the study area was also assessed quantitatively using Krishna model. The groundwater potential was estimated as 26.8million cubic meters annually.Analysis of groundwater pollution potential indicated that out of total area of the LGA, 27.6% of the area equivalent to 31Km2 is highly vulnerable to groundwater pollution. The climatic variation of the study area indicated that rainfall and temperature increase at 0.031mm and 0.36oC respectively. The assessment of rural water supply scheme for investment plan and gaps to be filled to meetSustainable Development Goals (SDG)-6on universal coverage to water Supply was performed, the result revealed that 353 numbers of Boreholes and rehabilitation of 15 numbers dysfunctional scheme will be required with total cost of NGN940,332,124. Generally the result obtained from this research showed that GIS and the models used provide a powerful tool in the assessmentsof groundwater resources for effectiveplanning and management. The study area is viable for rural water supply scheme siting. The amount of groundwater available is sufficient to meet the immediate and remotely domestic water demand of 2.0m3/year and 3.21m3/year respectively withexpected domestic water supply demand average increase rate of 3.43% annually while the public groundwater use rate of 7.48% and 12.0% for 2015 and 2030 respectively. It is therefore recommended that Motorized and hand pump schemes be situated in area demarcated as high and moderate potential respectively while high risk area should be avoided for well siting pending the detail assessment for pollutants identification and remediation measures.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 89       🧠 Words: 11927       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 478      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

MATHEMATICAL MODELLING OF DRAUGHT CHARACTERISTICS OF SELECTED ANIMAL-DRAWN IMPLEMENTS ON THE UPLAND SOILS OF SAMARU, NIGERIA EXERGY AND ECONOMIC ANALYSES OF POLYMER ELECTROLYTE MEMBRANE (PEM) FUEL CELL SYSTEM CONFIGURATIONS A STOCHASTIC LINEAR PROGRAMMING APPROACH FOR THE PRODUCTION, DISTRIBUTION AND INVENTORY SYSTEMS OF THE NIGERIAN BOTTLING COMPANY (NBC) Settling Characteristics of Kubanni Dam Water PERFORMANCE EVALUATION OF DOWNDRAFT GASIFIER FOR SYNGAS PRODUCTION USING RICE HUSK IRRIGATION WATER FROM SMALL SCALE EXCAVATIONS IN A DRY RIVER BED DEVELOPMENT OF A TRAFFIC LIGHT CONTROLLER MODEL USING ARTIFICIAL BEE COLONY BASED ADAPTIVE DYNAMIC SCHEDULING ALGORITHM DEVELOPMENT OF AN IMPROVED SHORT-TERM PEAK LOAD FORECASTING MODEL BASED ON SEASONAL AUTOREGRESSIVE INTEGRATED MOVING AVERAGE AND NONLINEAR AUTOREGRESSIVE NEURAL NETWORK FOR NIGERIA POWER SYSTEM GRID INFLUENCE OF FINES CONTENT ON WATER AND CHEMICAL FLOWS THROUGH COMPACTED LATERITIC SOIL LINERS DESIGN OF WATER SUPPLY (COLD AND HOT) SYSTEM OF A THREE BEDROOM BUNGALOW WITH ADEQUATE PRESSURE APPLICATION OF ZEOLITE 4A – METAKAOLIN MATRIX FOR THE REMOVAL OF SOME HEAVY METALS FROM CRUDE OIL TANK FARM WASTEWATER DEVELOPMENT OF AN IMPROVED APPLICATION SPECIFIC TUNELLING PROTOCOL SELECTION SCHEME FOR SITE TO SITE VIRTUAL PRIVATE NETWORKS INFLUENCE OF TEMPERATURE ON ASPHALT CONCRETE IN NIGERIA DESIGN, CONSTRUCTION AND TESTING OF A ZEOLITE-WATER SOLAR ADSORPTION REFRIGERATOR DETERMINATION OF AN IMPROVED SPECTRUM SENSING THRESHOLD FOR COGNITIVE RADIO USING SMOOTHED PSEUDO WIGNER-VILLE DISTRIBUTION KINETIC STUDIES OF MIDDLE DISTILLATE FORMATION DURING CATALYTIC CRACKING OF HEAVY GAS OIL USING ZEOLITE-Y PREPARED FROM KANKARA-KAOLIN COST MODELLING FOR ROAD ACCIDENTS IN NIGERIA OPTIMUM DESIGN OF REINFORCED CONCRETE RAFT FOUNDATIONS USING FINITE ELEMENT ANALYSIS UPGRADING OF WASAGU (KEBBI STATE) MANGANESE ORE TO METALLURGICAL GRADE CONCENTRATE PREPARATION AND APPLICATION OF ZnO/MULLITE FOR THE INACTIVATION OF ESCHERICHIA COLI AND SALMONELLA ENTERICA IN WATER

click on whatsapp