Site Logo E-PROJECTTOPICS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE PROPOSED KIRI HYDRO-ELECTRIC POWER PROJECT


📝


Presented To


Engineering Department

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 217      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis assesses the potential environmental as well as the social impacts that are associated with the conversion of Kiri dam to a hydro-electric power dam. As case studies, five villages namely; Mabonde, Gelode, WuroJauro, Kiri and New Talum in the Guyuk District of the Adamawa State region respectively, were selected for questionnaire survey and scheduled focus group discussion. A total of 150 questionnaires were administered in the villages and 8 persons from each village were involved in the scheduled focus group discussions. Consultations were made to the institutional stakeholders of the project planning including GOBADEC, UBRBDA, State Ministry of Environment Yola, and State Ministry of Works Yola to ascertain their understanding of the project impacts on the environment. Site visit was also undertaken to ascertain the formation and modification of the of the proposed project environment since the inception of the dam. Geographic Information Systems and remote sensing was applied to study the changes in land-use and vegetation cover since the impoundment of the river in 1982 and it was found that 27.77 km2 of land was lost to the lake reservoir, 20.96 km2 of land was lost to flood plains and 6.82 km2 of land lost to agriculture/settlement, totalling 55.55 km2 of land lost in the last two decades. The result of the study has revealed that the potential adverse impacts of the proposed project such as flooding, pollution and threat to public health to mention a few, are mostly limited to the construction stage of the project. However, numerous benefits such as boost to economic growth, skill transfer to locals and increase in local economic activities are to be enjoyed during both the construction and operational stages of the hydropower project. To avert the potential adverse environmental and social problems in the area, the study recommends equal partnership between the project owners, responsible authority (UBRBDA) with the local people to combat environmental degradation. Furthermore, the use of computer based technologies like Remote Sensing and Geographical Information System (GIS) should be implemented to play a major role in assisting and combating the problems within the lake and dam catchment areas.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 12537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 217      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

RADIAL DISTRIBUTION NETWORK MODELING AND ANALYSIS CONSIDERING POWER FLOW AND RECONFIGURATION SILTING CHARACTERISTICS OF DISTRIBUTARIES IN KANO RIVER PROJECT ASSESSMENT OF MUNICIPAL SOLID WASTE IMPACT ON GROUNDWATER QUALITY OF SOME SELECTED AREAS NON-CIRCULAR BORING ON THE LATHE USING CHAIN DRIVE FOR POWER TRANSMISSION DEVELOPMENT OF A SENSITIVITY INDEX BASED TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER PLACEMENT WITH CONTINGENCY ANALYSIS ON NIGERIA 330kV TRANSMISSION NETWORK DESIGN AND FABRICATION OF AIR SAMPLER IN AIR QUALITY ASSESSMENT FOR SELECTED HEAVY METALS FAILURE EVALUATION OF ENGINEERING PROJECTS IN NIGERIA DEVELOPMENT OF ENVIRONMENTALLY FRIENDLY BIODEGRADABLE CUTTING FLUID FROM SOYA BEANS (GLYCINE MAX) RELIABILITY ANALYSIS OF HIGH VOLTAGE POWER EQUIPMENT IN AJAOKUTA STEEL COMPANY LIMITED (ASCL) STOCHASTIC ASSESSMENT OF NIGERIAN TIMBERS FOR BRIDGE DECKS IN ACCORDANCE TO AASHTO LFRD A STUDY OF THE UNIFIED POWER QUALITY CONDITIONER (UPQC) FOR IMPROVED RADIAL DISTRIBUTION NETWORK EXPERIMENTAL STUDY OF VARIABLE FREQUENCY INDUCTION GENERATOR FOR SMALL SCALE WIND POWER DEVELOPMENT Suitability Assessment of Kurumu, Garin-maiganga, Gindiakwati and Ogboyoba Coal Deposit Properties for Power Generation RELIABILITY ASSESSMENT OF RC CONTINUOUS BEAM DESIGNED TO BS 8110 (1985) CRITERIA BIOCLIMATIC RESPONSE IN DESIGN OF FACULTY OF ENVIRONMENTAL SCIENCES IN THE HOT DRY CLIMATE OF YOBE STATE UNIVERSITY (YSU), DAMATURU DEVELOPMENT OF AN IMPROVED ALGORITHM FOR POWER LINE DETECTION IN OPTICAL IMAGES USING FRANGI FILTER AND FIRST ORDER DERIVATIVE OF GAUSSIAN FLOOD RISK ASSESSMENT OF OFU RIVER CATCHMENT IN NIGERIA ESTIMATION OF THE EFFECT OF IRRIGATION ON ANNUAL RECHARGE AT THE KANO PROJECT AREA OF KANO RIVER BASIN DEVELOPMENT OF A MODIFIED ARTIFICIAL FISH SWARM ALGORITHM PARTIAL TRANSMIT SEQUENCE TECHNIQUE FOR PEAK TO AVERAGE POWER RATIO REDUCTION IN ORTHOGONAL FREQUENCY DIVISION MULTIPLEXING ASSESSMENT OF TRANSIENT STABILITY ENHANCEMENT CAPABILITY OF UNIFIED POWER FLOW CONTROLLER IN A MULTI-MACHINE POWER SYSTEM

click on whatsapp