Site Logo E-PROJECTTOPICS

A STUDY OF THE RAPID METHOD OF EARTHWORK CONSTRUCTION CONTROL


📝


Presented To


Engineering Department

📄 Pages: 86       🧠 Words: 12500       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 314      

⬇️ Download Now!

ABSTRACT
In earthwork construction the parameter used to check the effectiveness of compaction is the Relative Compaction, a parameter which cannot be evaluated until field density tests and laboratory compaction tests on representative portions of the material have been performed. The Standard Method of arriving at this value of Relative Compaction is time - consuming because the Standard Method of performing the laboratory compaction test (to obtain the Optimum Moisture Content, OMC, and Maximum Dry Density, MDD) requires airdrying, ovendrying to determine moisture contents, and five points to plot a compaction curve- The overall effect is that the OMC and MDD will not be known until the following day. This is a shortcoming in earthwork construction where time is, indeed, money. The Rapid Method can give accurate values of OMC and MDD about an hour after digging a density hole, and hence a much faster means of assessing the effectiveness of compaction. The object of this research has been to check the accuracy of the OMC and MDD values determined by the Rapid Method. Thirty five soil samples were used, and statistical analysis carried out on the results of the OMC and MDD obtained using the two methods on each sample, indicated that the Rapid Method is not only faster, but as accurate as the Standard Method.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 86       🧠 Words: 12500       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 314      

⬇️ Download Now!

click on whatsapp