Site Logo E-PROJECTTOPICS

ESTIMATION OF STREAMFLOW IN THE UPPER BENUE RIVER BASIN USING CLIMATIC WATER BUDGET METHOD


📝


Presented To


Engineering Department

📄 Pages: 91       🧠 Words: 9684       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 268      

⬇️ Download (Complete Report) Now!

ABSTRACT
Water is a fundamental element in the economic and social development of any country. A survey of surface water development in the Upper Benue Basin is made here in and availability of necessary data for water resources development discussed. A set of average monthly Temperature and Rainfall data have been used to estimate monthly streamflow values at three gauging stations by the Book keeping technique of the Climatic VJater Budget analysis. After a few trials, each time using a set of values for VJater Holding Capacity of soils and other factors of the Budget analysis, monthly streamflow values were arrived at which compare favourably with corresponding observed (measured) strcamflows at the gauging stations. Another set of Temperature and rainfall data is then used in conjuction with the final set of values of VJater Holding capacity and other factors like overland runoff (Direct Runoff) and channel conveyance coefficients to estimate monthly Runoff for three consecutive years at one of the gauging stations. The result of this exercise shows that the Climatic VJater Budget method can be reliably applied to the various sub-basins of the Benue River to estimate streamflows from rainfall data.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 91       🧠 Words: 9684       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 268      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EXTRACTION AND CHARACTERISATION OF CHITIN AND CHITOSAN FOR CHROMIUM (VI) ION REMOVAL FROM WASTEWATER PREPARATION AND APPLICATION OF ZnO/MULLITE FOR THE INACTIVATION OF ESCHERICHIA COLI AND SALMONELLA ENTERICA IN WATER POLLUTION AND SELF PURIFICATION STUDIES OF RIVER ROMI, CHIKUN LOCAL GOVERNMENT AREA KADUNA STATE SEPARATION OF TANTALUM AND NIOBIUM FROM NIGERIAN TANTALITE USING AQUEOUS BIPHASE SYSTEM MODELLING AND STRUCTURAL ANALYSIS OF THE BALL-ON-SPHERE SYSTEM USING BOND GRAPH TECHNIQUE DEVELOPMENT OF A ROBUST DIGITAL IMAGE WATERMARKING TECHNIQUE IN DISCRETE ORTHONORMAL STOCKWELL TRANSFORM DOMAIN BASED ON PHOTON POLARIZATION DEVELOPMENT OF A FIREFLY ALGORITHM BASED ANALYTICAL METHOD FOR OPTIMAL LOCATION AND SIZING OF DISTRIBUTED GENERATION IN RADIAL DISTRIBUTION NETWORKS EVALUATION OF THE FACTORS AFFECTING THE SELF-PURIFICATION CAPACITY OF RIVER KADUNA, NIGERIA MODELLING AND OPTIMIZATION OF PID CONTROLLER’s PARAMETERS FOR DEEP SPACE ANTENNA POSITIONING SYSTEM USING GENETIC ALGORITHM DEVELOPMENT OF EUCALPYTUS TERETICORNIS COMPOSITE (BARKS AND LEAVES) ADSORBENT FOR ADSORPTION OF CHROMIUM (VI) AND LEAD (II) IONS FROM SIMULATED WASTEWATER APPLICATION OF ZEOLITE 4A – METAKAOLIN MATRIX FOR THE REMOVAL OF SOME HEAVY METALS FROM CRUDE OIL TANK FARM WASTEWATER DESIGN AND DEVELOPMENT OF A CARBONATOR FOR CARBON DIOXIDE CAPTURE USING LOCALLY PRODUCED LIME TIME-SERIES FORECAST OF NIGERIA’S ELECTRICITY STATISTICS FROM 1991-2028 USING AUTO-REGRESSIVE INTEGRATED MOVING AVERAGE (ARIMA) MODEL ASSESSMENT OF THE IMPACT IMPACT OF CLIMATE CHANGE ON WATER RESOURCES AVAILABILITY IN THE SOKOTO-RIMA RIVER BASIN Estimation and Characteristics of Fluvial Sediment Deposits into Kubanni Reservoir, Zaria PERFORMANCE ENHANCEMENT OF WATER SUPPLY DISTRIBUTION IN MINNA METROPOLIS COMPARATIVE STUDIES OF THE PERFORMANCE OF FILTER MEDIA MADE USING BIOCHAR AND ACTIVATED CARBON IN GREYWATER REMEDIATION DESIGN, SIMULATION ,CONSTRUCTION AND TESTING OF A THERMOSYPHON SOLAR WATER HEATER FOR A BLOCK IN POSTGRADUATE HOSTEL MODELING OF WATER QUALITY OF BINDARE STREAM IN ZARIA-NIGERIA USING MATLAB A STUDY OF THE RAPID METHOD OF EARTHWORK CONSTRUCTION CONTROL

click on whatsapp