Site Logo E-PROJECTTOPICS

DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 95       🧠 Words: 9168       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 339      

⬇️ Download (Complete Report) Now!

ABSTRACT
Scholars posit for the reengineering of the traditional management concept that is still significantly applied in managing building projects. Blending with the conventional understanding of the theory of production and the uniqueness of construction projects, the concept clogs the wheel of progress in the practice of construction art. Apart from being late, the traditional management model, which is reactive in nature, responds to management challenges sub-optimally. This underscores poor cost and time efficacy in building contracts. While it is widely recommended that proactive management is a feasible way of addressing cost escalation (cost growth), the subject has so far received poor research attention. Synthesis suggestsan array of existing remedies to diverse cost management challenges, but with dearth of proactive tendencies. This thesis developed a proactive cost management model (PCMM) for building projects in Nigeria. Being proactive is essentially being preemptive in management. Theorising also is that cost growth which culminates from the dual dimensions of market forces and process flaws is fueled if not caused by poor prediction techniques. This work established four sub models, including: Lessons Learnt Mechanism, Graphical Models, Best Practice Modules and a Mathematical Model which formed the components of the PCMM. The Grubb's Method test of outliers, ANOVA, Kolmogorov-Smirnov Test of normality, Geometric Mean and Linear Correlation were applied to mass historical cost data collated over ten years. Analyses established the validity of the cost data as research samples. Computed were the historical total cost and the cost growth factors of various elements of a specified building design. Findings established annual elemental cost growth factors as: Substructure-0.1540; Frames-0.1580; Upper Floors-0.1180; Roof-0.1100; Staircase-0.0236; External Walls-0.3260; Internal Walls and Partitions-0.1720; Wall Finishes-0.0525; Floor Finishes-0.0810; Ceiling Finishes-0.0760 and Fittings and ix Fixtures- 0.0710. Cost growth in construction projects in Nigeria was found to be significant over short period. Construction materials were classified into two categories, each category exhibiting a unique pattern of response to market forces. A mathematical model developed was used to predict the cost of a prototype building at various milestones. Values were compared with estimates obtained from first principle. A strong positive linear correlation coefficient of 0.92571 and a ?no significant difference? between the samples were established. These pieces of information were fused into a PCMM that should be used to predict cost changes due to market forces and process flaws in ongoing building projects. Managers should also be mindful in the sequence of the assembly process, and the choice of inventory keeping and consumption, putting into cognisance the varying response levels of materials to market forces towards cost efficacy. A computer programme can be developed to implement this concept better. More historical cost data can be collated for another timeframe so as to compute and compare the cost growth factors towards establishing permanent values.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 95       🧠 Words: 9168       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 339      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

COMMUNITY BUILDINGS COMPLEX DEVELOPING A FRAMEWORK FOR THE MARKETING OF QUANTITY SURVEYING SERVICES DEVELOPING THE YORUBA ALPHABET AS A TYPOGRAPHIC FONT STYLE FOR APPLICATION ON COMPUTER GRAPHIC DESIGN FOR YORUBA AUDIENCE A CONCEPTUAL EXPLORATION OF NIGERIA'S HISTORICAL EXPERIENCES IN CLAY FORM AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS IN NIGERIAN FEDERAL UNIVERSITIES EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES ANALYSIS OF WOMEN'S PARTICIPATION AND INCORPORATION IN WASTE PICKING AND SOLID WASTE MANAGEMENT IN SOKOTO METROPOLIS AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA TENDER MANAGEMENT AND BID EVALUATION FOR OPTIMUM RESULTS BUILDING FAILURES EFFECTS OF SUGAR AS RETARDER ON THE PROPERTIES OF CONCRETES MADE WITH SELECTED BRANDS OF PORTLAND CEMENT IN NIGERIA ASSESSMENT OF RESIDENTS' ATTITUDES TOWARDS RECREATION IN BIDA-NIGERIA ANALYSIS OF THE DETERMINANTS OF PARTICIPATION OF STAKEHOLDERS IN SOLID WASTE MANAGEMENT UNRRODUCTIVE COSTS IN BUILDING PROJECTS KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL AN APPRAISAL OF ATYAP PERFORMING ARTS OF ZANGON KATAF KADUNA STATE, NIGERIA (1950 – 2013) RISK IDENTIFICATION AND ASSESSMENT IN HOUSING DEVELOPMENT PROJECTS USING ANALYTICAL HIERARCHICAL PROCESS AN APPRAISAL OF THE DEVELOPMENT AND MANAGEMENT OF ORGANISED OPEN SPACES IN KADUNA METROPOLIS PROPOSAL FOR PRIVATE AIRLINES TERMINAL BUILDING MURTALA MOHAMMED AIRPORT LAGOS

click on whatsapp