Site Logo E-PROJECTTOPICS

AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 97       🧠 Words: 6227       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 445      

⬇️ Download (Complete Report) Now!

ABSTRACT
This study assessed the methods that the design team members use to manage the information that is based on the cost (client's budget) of the project, and also their efficacy. It also examined factors limiting members of the design team from adopting modern cost-based information management methods. In addition, it examined the attitudes of design team members towards Information and Communication Technology (ICT) and sought to discover how the design team members rated the local industry's ICT standards against ICT standards of foreign industries. Structured questionnaires captured data, which were analyzed using percentages. In addition, the mean value of the responses was also calculated based on the weighting attached to the responses provided by each category of design professionals studied. The findings of this research indicated that design team members (84.44%), store their information via a combination of hard and soft copy. Also, the design professionals (71.11%) are not hindered from adopting modern cost based information management practices, and they are proficient (approximate mean value of 3) in using computerized cost based information management tools. More facts obtained from this research showed that design professionals (approximate grand mean value of 3) believe that modern cost based information management tools are effective and efficient in managing information. They (approximate grand mean of 4), also rate the domestic industry's ICT standards as poor. The work concludes that the ICT standards in the domestic construction industry is low and needs to be brought to par with the standards possessed by industrialized nations. To achieve this, it is recommended that design professionals should be encouraged to fully automate their information management and shift away from "paper based" information management practices.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 6227       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 445      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

AN EVALUATION OF PASSIVE DESIGN PRINCIPLES IN THE DESIGN OF PROPOSED SHOPPING MALL FRAMEWORK FOR SUSTAINABLE DESIGN OF PHOTOVOLTAIC HOME SYSTEMS IN NORTH-WESTERN NIGERIA ADAPTATION OF TRADITIONAL DESIGN CONCEPTS FOR KANO STATE HISTORY AND CULTURE BUREAU COMPLEX THE DESIGN AND FABRICATION OF TILE MAKING MACHINE APPRAISAL OF SANITARY FACILITIES IN PUBLIC AREAS OF GARKI DISTRICT CALABAR MUNICIPAL RECREATION CENTRE EXPRESSION OF INDIGENOUS CONTEXT IN RECREATIONAL FACILITY DESIGN SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT ABUJA INTERNATIONAL TRADE FAIR COMPLEX AN APPRAISAL OF PHYSICAL INFRASTRUCTURES IN TRADE FAIR CENTRES IN NIGERIA AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLES CONTEXTUALISATION OF POTHOLES ON NIGERIAN ROADS IN PAINTING EVALUATING ENERGY EFFICIENCY IN THE DESIGN OF LARGE SCALE OFFICE BUILDING IN HOT-DRY CLIMATE OF NIGERIA APPLICATION OF PASSIVE COOLING TECHNIQUES IN THE DESIGN OF PROPOSED UNIVERSITY SENATE BUILDING GLAZED SURFACE AS A TOOL FOR ENHANCING ENERGY EFFICIENCY IN THE DESIGN OF ULTRA-MODERN SHOPPING MALL INTEGRATING PRINCIPLES OF PASSIVE COOLING IN THE DESIGN OF FIVE STAR HOTEL, MINNA DADIN KOWA HOLIDAY CAMP GOMBE: (Eco-Approach to the Design of a Holiday Camp) NIGERIAN AIRFORCE BASE, YOLA (ARCHITECTURE FOR DEFENCE) ADAPTING SOME SELECTED MOTIFS OF ZARIA WALL DECORATIONS FOR CERAMIC TILE DESIGNS AND PRODUCTION EXPLORING THE CONCEPT OF INCREMENTAL HOUSING IN THE DESIGN OF PROPOSED ABU PHASE-II STAFF HOUSING ZARIA PATTERN AND URBAN MANAGEMENT CHALLENGES OF DEVELOPMENT CONTROL VIOLATIONS AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA

click on whatsapp