Site Logo E-PROJECTTOPICS

ESTIMATES AS A TOOL FOR BUILDING PROJECT COST CONTROL


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 86       🧠 Words: 6482       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 308      

⬇️ Download (Complete Report) Now!

ABSTRACT
Estimates as a Tool for Building Project Cost Control is a phenomena by those who have been monitoring the cost of building construction. The building industry is characterised as highly competative, very risky and with low profit margin. The cost of construction in the past years has also been on steady increase with varied reasons which includes political influence, poor tendering procedures and inflation. But for a construction firm to maintain a competative edge in the market and also ensure Good Profit Margin and the client to have Value for the money expended for a construction project, the method by which they Design, Estimate, Plan and Control this project must be ACCURATE and EFFICIENT. The lack or inadequacy of the said method can be said to constitute some of the main perennial problems and reasons for the high cost of building construction. It is in the light of the above that the theme of the study was chosen in order to investigate on a building cost control system for minimising the cost of building construction during the project execution phase with much emphasis on the estimating process of the said cost control system. To achieve the above topic of discussion the study was divided into six chapters. These chapters dealt vividly on an introduction to the objective and structure of the thesis, concepts of a building cost control system, cost estimates and estimating procedures, contractor's cost elements, three site investigations, conclusion and recommendation. It is hoped that the study will be useful for a building cost control by contractors and client and for future researches on areas that were not extensively discussed.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 86       🧠 Words: 6482       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 308      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

UNRRODUCTIVE COSTS IN BUILDING PROJECTS EVALUATION OF ARCHITECTURE AS A TOOL TO ENHANCE CREATIVITY IN THE DESIGN OF A CENTRE FOR ARTS AND CREATIVITY NIGER STATE CERAMIC PROJECTS EVALUATING PASSIVE COOLING STRATEGIES FOR ENERGY EFFICIENCY IN THE DESIGN OF SENATE BUILDING FOR FEDERAL UNIVERSITY KASHERE, GOMBE STATE TOWARDS EVOLVING SUITABLE MODULAR SIZES FOR EFFECTIVE FLEXIBILITY IN ACADEMIC LIBRARY BUILDINGS: A PROPOSAL FOR FEDERAL UNIVERSITY OF TECHNOLOGY MINNA, LIBRARY COMPLEX AN EVALUATION OF FIRE PREVENTION AND CONTROL STRATEGIES IN THE DESIGN OF A MULTI-LEVEL MARKET BIOPHILIC DESIGN PATTERNS AS TOOLS FOR ENHANCING PATIENTS’ HEALING AND PSYCHOLOGICAL RECOVERY IN THE DESIGN OF NATIONAL CANCER HOSPITAL, ABUJA ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS CREDIT FACILITIES IN THE FINANCIAL INSTITUTIONS FOR FINANCING CONSTRUCTION PROJECTS IN NIGERIA EMBELLISHMENT OF FABRICS AND GARMENTS USING DESIGN MOTIFS FROM THE COSTUMES OF THE OBA OF BENIN EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES WORLD BANK INFRASTRUCTURE DEVELOPMENT FUND (IDF) PROGRAMME: AN ANALYSIS OF THE SUSTAINABILITY OF YOLA-JIMETA PROJECT USER REQUIREMENTS IN THE DESIGN OF MULTI-STOREY RESIDENTIAL BUILDINGS ASSESSMENT OF COMMUNITY PARTICIPATION IN THE KARU URBAN UPGRADING PROJECT IN-HOUSE PROFESSIONALS IN PROJECT DEVELOPMENT AND IMPLEMENTATION INCLUSIVE DESIGN AS A TOOL IN THE DESIGN OF SPORT COMPLEX FOR THE DISABLED A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL A SURVEY OF VISUAL AIDS DESIGN, PRODUCTION, USAGE AND EVALUATION IN ENHANCING TRAINING AND CAPACITY BUILDING MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA

click on whatsapp