Site Logo E-PROJECTTOPICS

ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 88       🧠 Words: 8473       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 186      

⬇️ Download (Complete Report) Now!

ABSTRACT
Building construction project has become an everyday issue, and this involves the spending of hard earned money by the project owner called the client. The expectation of the owner of any building project is justification of good project delivery. This is enabled by the objectives of the project which definitely includes project cost that envelopes the cost and quality of delivery at the expected time. The major issue, is the project cost which dictates its success. Project cost variance has been affecting the speedy and successful delivery of building construction projects. The key fact in this study method was to collect and analyse public building project cost estimates containing building components, which includes preliminaries, substructure, superstructure, mechanical/electrical, external works and contingency in the bill of quantity (BOQ) from projects handled by Education Trust Fund(ETF) in the tertiary institutions located in Kaduna, Kwara, Kogi and Abuja from 2009 to 2010. The study adopted mean component cost method modeled by Skitmore and Ng (2002) to determine the projected cost variance of the Lecture Theatres and Lecture Rooms handled by the organization in various tertiary institutions in Nigeria. The analysis of the data collected was made by using standard method of analysis which employs SPSS for the project costs.Skitmore and Ng (2002) model was employed to test the variability of the project cost data. The result shows that; the building component cost data 4782.50 had closer link to the mean 4773.92(mean) for preliminaries component column in project ID 4 of Lecture Theatreandanother component data 2797.62 is also close to 2312.91(mean) for Ext.Wkscolumn in project ID 7 for the Lecture Theatre building projects butfor the Lecture Classrooms building the preliminaries column had 1531.41 and 1416.33(mean) in project ID 2 and 1611.22 and 1673..58(mean) for M/E column for project ID 5. This project therefore concludes in addition to the results of the cost variances, that the lecture theatre and classrooms projects are underestimated.Interview was also conducted on the professional estimators in building industry. Moreover significant differences exist among the components in those public buildings.The analytical calculation shows that the correct variance for an average lecture theatre project from this research was found to be 34.73%. The sample analyzed had shown that the correct variance of the class room was found to be 38. 50%. Therefore lecture theatre is observed to be a better building project than the class room building. The study recommends the need to minimize the occurrence of the overrun by thoroughly crosschecking the initial estimate and addressing other technical issues before the contract is awarded. It also recommends the employment of the mean component cost method of analysis and setting of a committee to properly scrutinize the estimate.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 88       🧠 Words: 8473       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 186      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

MODELING DURATION OF BUILDING RENOVATION PROJECTS AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS A STUDY OF CONTEMPORARY PUBLIC OUTDOOR SCULPTURES IN FOUR SELECTED STATES IN WESTERN NIGERIA COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY DEVELOPMENT OF PUBLIC PROCUREMENT STRATEGY FOR THE PROVISION OF POTABLE WATER INFRASTRUCTURE TO LOW INCOME URBAN AREAS (LIUAs) EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES AN APPRAISAL OF THE CRITICAL SUCCESS FACTORS OF PROJECT PARTNERING TOWARDS ITS ADOPTION IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSMENT OF HUMAN RESOURCE MANAGEMENT PRACTICES OF BUILDING CONSTRUCTION FIRMS THE EFFECTS OF THE SOCRATIC METHOD ON STUDENTS ART PERFORMANCES IN SECONDARY SCHOOLS TOWARDS EVOLVING SUITABLE MODULAR SIZES FOR EFFECTIVE FLEXIBILITY IN ACADEMIC LIBRARY BUILDINGS: A PROPOSAL FOR FEDERAL UNIVERSITY OF TECHNOLOGY MINNA, LIBRARY COMPLEX EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA APPRAISAL OF THE IMPLEMENTATION OF TINAPA TOURIST RESORT PROJECT AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY THE SIGNIFICANCE, MEANINGS AND AESTHETIC VALUES OF SOME NIGERIAN ARMY BADGES THE EFFECTS OF ASSIGNMENT METHOD OF TEACHING ON STUDENTS’ PERFORMANCE IN ART IN SECONDARY SCHOOLS USE OF BUILDING FORMS AS ACOUSTICAL TREATMENT IN THE DESIGN OF AN IDOMA CULTURAL CENTRE SENATE BUILDING HERITAGE UNIVERSITY KADUNA KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS AN EXPRESSION OF IMAGERY IN COURT BUILDINGS

click on whatsapp