MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA


📝


Presented To


Environmental Design Department

📄 Pages: 86       🧠 Words: 11537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 111      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSim version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of project's value for money benchmarked against initial cost estimate.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 86       🧠 Words: 11537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 111      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

APPLICATION OF PASSIVE COOLING TECHNIQUES IN THE DESIGN OF PROPOSED UNIVERSITY SENATE BUILDING BIOPHILIC DESIGN PATTERNS AS TOOLS FOR ENHANCING PATIENTS’ HEALING AND PSYCHOLOGICAL RECOVERY IN THE DESIGN OF NATIONAL CANCER HOSPITAL, ABUJA AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS A POST OCCUPANCY EVALUATION OFPATIENTS' SATISFACTION WITH NIGER STATE GOVERNMENT HOSPITAL BUILDINGS EVALUATING THE EFFECTS OF BUILDING FORMS ON THERMAL COMFORT IN OFFICE BUILDINGS IN HOT HUMID AREAS AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVISION OF BUILDING SERVICES IN MULTI-STOREY BUILDINGS ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS ASSESSMENT OF THE INTEGRATION SCHEME IN ABUJA COMMUNITY BUILDINGS COMPLEX EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS ASPECT RATIO OF BUILDING FORM AS A TOOL FOR ENHANCING THERMAL COMFORT IN THE DESIGN OF A TELECOMMUNICATIONS OFFICE BUILDING (MAIDUGURI) MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL PROTOTYPE DESIGN AND COSTRCTION OF A TWO-CHAMBER INTERMITTENT TANK FURNACE FOR SIMULTANEOUS DUAL STUDIO GLASS MELTING IN NIGERIA CREDIT FACILITIES IN THE FINANCIAL INSTITUTIONS FOR FINANCING CONSTRUCTION PROJECTS IN NIGERIA DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA AN EVALUATION OF DISASTER PREPAREDNESS IN INDUSTRIAL BUILDINGS LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE)

click on whatsapp