Site Logo E-PROJECTTOPICS

AN APPRAISAL OF CONSTRUCTION PROJECT PLANNING IN NIGERIAN INDIGENOUS CONSTRUCTION COMPANIES


📝


Presented To


Environmental Design Department

📄 Pages: 92       🧠 Words: 7373       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 407      

⬇️ Download (Complete Report) Now!

ABSTRACT
Planning in construction involve defining the activities, actions, time, cost, durations and performance milestone which will result into successful completion of the project. Previous researches attributed insufficient construction planning to Nigerian indigenous construction companies, this insufficiency in construction planning was found to contribute to their low productivity, profitability, time overrun and cost overrun. This study was carried out to assess construction project planning of indigenous contractors with a view to enhance their performance. The objectives of the research were to assess contractors' perception of construction project planning, articulation of contractors' current method of construction project planning and assessing the efficiency of each contractor's method of planning construction projects. The methodology of the research involve use of purposive sampling technique, sample size of 50 companies was determined using 90% confidence level from a population size of 1920 calculated with sample size table and formula. Questionnaire was self-administered to respondents, questionnaire (A) was administered to project managers of the organizations which contains questions that aim at assessing how organizations plan and what planning entails in their organizations, this questionnaire record 83% response rate. Questionnaire (B) was administered to professionals in the organizations who manage construction on site, questionnaire (B) aim at assessing the effectiveness of construction planning, problems associated with construction planning and how to improve construction planning, questionnaire (B) records 88% response rate. Questionnaires were analyzed and results was presented in tables and bar charts. Findings from the research revealed that construction project planning is insufficient and requires improvement. Cost overrun, time overrun, poor scope control and reduction in profit are problems experienced by vi contractors. The failure of construction project planning was attributed to client unethical dealings, lack of integrity in financial dealings of client and poor communication among project members. In order to improve planning of construction project, the research recommends contractors to perform financial and ethical check on client, employ distinct project manager to each project, employ the use of computerised systems and experience in planning construction projects. The research also recommend contractors to improve communication among project team through establishment of reliable and accessible communication channel.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 92       🧠 Words: 7373       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 407      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT EVALUATION OF THE EFFECTIVENESS OF HEALTH AND SAFETY TRAINING PRACTICES OF CONSTRUCTION FIRMS PERCEPTION OF CONSTRUCTION PROFESSIONALS ON ATTRIBUTES OF PROJECT SPONSORS AND CONCESSIONAIRES OF PUBLIC PRIVATE PARTNERSHIP PROJECTS A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL PLANNING FOR THE URBAN INFORMAL SECTOR IN ABUJA CITY EVALUATING LESSONS LEARNED PRACTICES (LLPs) IN PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS IN NIGERIA PLANNING OF URBAN MARKETS: A STUDY OF THE PHYSICAL CHARACTERISTICS OF MARKETS IN KANO METROPOLIS AND PLANNING PROPOSALS CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY ENVIRONMENTAL RESPONSIBILITY AND PERFORMANCE OF QUOTED OIL COMPANIES IN NIGERIA AN ASSESSMENT OF THE PARTICIPATORY ATTRIBUTES OF CONSTRUCTION PROFESSIONALS FOR EFFECTIVE VALUE MANAGEMENT ANALYSIS OF MODAL SPLIT CHARACTERISTICS FOR EFFICIENT TRANSPORT PLANNING POLICY AN APPRAISAL OF SOFT SKILLS REQUIRED FOR SUCCESSFUL PROJECT MANAGEMENT OF CONSTRUCTION PROJECTS AN INVESTIGATION INTO BUILD OPERATE AND TRANSFER IN THE PROVISION OF HOSTELS IN NIGERIAN FEDERAL UNIVERSITIES DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA COST IMPLICATIONS OF VARIATIONS IN CONSTRUCTION PROJECTS IN NIGERIA A SURVEY OF CONCRETE PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA DEVELOPING MODELS FOR PREDICTING THE IMPACT OF RISK FACTORS ON CONSTRUCTION CONTRACTORS’ CASH FLOW FORECASTS IN NIGERIA PLANNING THE PHYSICAL DEVELOPMENT OF LOKOJA CENTRAL AREA IN-HOUSE PROFESSIONALS IN PROJECT DEVELOPMENT AND IMPLEMENTATION AN EVALUATION OF THE SPATIAL PLANNING INPUT IN THE NINGI DEVELOPMENT AREA OF THE BAUCHI STATE INTEGRATED RURAL DEVELOPMENT PROGRAMME (BASIRDP)

click on whatsapp