Site Logo E-PROJECTTOPICS

URBAN MANAGEMENT CHALLENGES FOR WATER SUPPLY IN PERIPHERAL SETTLEMENTS

(A CASE STUDY OF KADUNA METROPOLIS)


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 95       🧠 Words: 6268       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 195      

⬇️ Download (Complete Report) Now!

ABSTRACT
The need for water cannot be overemphasized as water is crucial for healthy living. Despite this, access to portable water in many urban areas still remain a huge challenge. Giving that attempts are being made to surmount water problems of cities, little is being done to overcome water problems of peripheral settlements. Most studies on water delivery have rather emphasize the urban challenge, combined both core and periphery which has fallen short of reporting the difficulty residents of periphery are faced with in order to meet daily water needs. The research narrows to investigating water supply and demand characteristics resulting to urban management challenges as a result of water supply problems of these areas. Data collection and analysis was conducted in 70% of the identified peripheral settlements of Kaduna metropolis. A sample size of 0.5% of 61,182 household constituted 305 questionnaires, from which only 269 were retrieved for analysis. Results revealed poor access to pipe borne water and over dependence on boreholes and wells, which lacks the capacity of supplying the required water quantity. Attempts to meet needs is responsible for patronage of water vendors with high cost and health implications. The hope to secure pipe borne supply from the metropolis is far-fetched as the KSWB lacks the capacity to meet water demand of the metropolitan core let alone the periphery. To address the water supply shortage of peripheral settlements, there is the need to plan and manage new growth points. Also to ensure that commercial borehole operators are organized to supply water to existing peripheral settlements at regulated price; and the capacities of existing water treatment plants serving the metropolis be increased to cater for the excess population of the core as well as the periphery. Pipe borne supplies to peripheral settlements should commence with those that currently have provision for supply.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 95       🧠 Words: 6268       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 195      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

RECONSTRUCTION OF CENTRAL MARKET, JOS; Exploring Architectural Determinants to Urban Renewal ENCROACHMENT OF CITIES ON SUB-URBAN SETTLEMENTS PLANNING FOR THE URBAN INFORMAL SECTOR IN ABUJA CITY ASSESSMENT OF GRAPHIC DESIGN CURRICULAR OF NIGERIAN UNIVERSITIES IN RELATION TO DIGITAL CHALLENGES FACED BY FRESH GRADUATES IN THE PRINTING INDUSTRY APPRAISAL OF THE URBAN MANAGEMENT CHALLENGE OF INFORMAL LAND DELIVERY DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA AN ASSESSMENT OF EXPATRIATE CONTRACTORS’ SITE MANAGEMENT PRACTICES IN THE NIGERIAN CONSTRUCTION INDUSTRY AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY URBAN MANAGEMENT IMPLICATIONS OF PERI URBAN GROWTH SOME ASPECTS OF URBAN DESIGN GLASS RECYCLING IN WASTE MANAGEMENT ASSESSMENT OF KNOWLEDGE MANAGEMENT CAPABILITIES OF THE NIGERIAN QUANTITY SURVEYING FIRMS AN EVALUATION OF URBAN DEGENERATION IN ABA CORE AREA AND A PHYSICAL PLANNING PROPOSAL FOR A SELECTED AREA APPRAISAL OF ABUJA METROPOLITANT MANAGEMENT COUNCIL (AMMC) STRUCTURE AND PROCESS PATTERN AND URBAN MANAGEMENT CHALLENGES OF DEVELOPMENT CONTROL VIOLATIONS AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS APPRAISAL OF STAKEHOLDER MANAGEMENT PRACTICE IN TERTIARY EDUCATION TRUST FUND (TETFUND) CONSTRUCTION PROJECTS KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL ASSESSING THE INFLUENCE OF KNOWLEDGE MANAGEMENT ENABLERS ON ORGANISATIONAL PERFORMANCE OF CONSTRUCTION CONSULTANCY FIRMS

click on whatsapp