Site Logo E-PROJECTTOPICS

OPTIMISING PATIENTS FLOW AND RESOURCES UTILISATION IN THE OUT-PATIENT DEPARTMENT OF A PUBLIC HOSPITAL A CASE STUDY OF YUSUF DANTSOHO MEMORIAL HOPITAL KADUNA


📝


Presented To


Engineering Department

📄 Pages: 90       🧠 Words: 9600       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 399      

⬇️ Download (Complete Report) Now!

ABSTRACT
Queuing theory as a tool for optimising patients flow and resources utilisation in the female section of the OPD at Yusuf Dantsoho memorial hospital Kaduna, the study was conducted for a period of 5 days. Simple queuing theory calculations were done using the data collected in the evaluation of the performance characteristics of the system, i.e. the average utilisation of the servers, the probability that the system would be idle, the average number of patients in the queue and the average time a patient spends in the system. These parameters are used by hospital managers in making better decisions as it relates to the management of queues, long wait times thus resulting in overcrowding at the OPD of most public hospitals, from the study it was established that the average arrival rate equal 34.4998 patients/hour which is greater than the mean service rate (mu) = 18.0867 patients/hour at the records section and 14.5226 patients/hour at the consultation unit, this accounted for the high utilisation at the servers thus leading long queues and subsequently long wait times at the OPD. QM software for windows was used to model 5 cases using a server capacity of 3, 4, 5, 6 and 7 doctors at post in the female section of the OPD and it was established that for optimum performance 5 doctors need to be available for service at the OPD at a time as compared to an average of 3 doctors which is presently obtainable at the female section of the OPD during the study.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 90       🧠 Words: 9600       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 399      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATING SERVICE DELIVERY PERFORMANCE OF WATER UTILITIES IN KADUNA STATE WATER BOARD DESIGN AND USE OF A MODEL CONSTRUCTED HORIZONTAL SUBSURFACE FLOW WETLAND FOR TREATING TANNERY WASTEWATER BY MEANS OF AQUATIC PLANTS COMPARATIVE STUDY OF DIFFERENT HONEYCOMB GEOMETRIES FOR THE SUPPRESSION OF CONVECTIVE HEAT TRANSFER IN FLAT PLATE SOLAR COLLECTORS ASSESSMENT OF TRANSIENT STABILITY ENHANCEMENT CAPABILITY OF UNIFIED POWER FLOW CONTROLLER IN A MULTI-MACHINE POWER SYSTEM INFLUENCE OF FINES CONTENT ON WATER AND CHEMICAL FLOWS THROUGH COMPACTED LATERITIC SOIL LINERS KINETIC STUDY OF PINEAPPLE (Ananas comosus) PEEL CONVERSION TO GLUCOSE BY Aspergillus niger) IMPACT OF VEHICULAR TRAFFIC EMISSIONS ON AMBIENT AIR QUALITY IN KADUNA METROPOLIS UTILISATION OF SELECTED VARIETIES OF COTTON PLANTS GROWN IN NIGERIA FOR PAPERMAKING COMPARATIVE STUDY OF BIOGAS PRODUCTION FROM COW DUNG, CHICKEN DROPPINGS AND CYMBOPOGON CITRATUS AS ALTERNATIVE ENERGY SOURCES A STUDY OF MODIFICATIONS OF FILLER DIMENSIONS AND THE EFFECT OF PHYSICAL AND MECHANICAL PROPERTIES OF PINEAPPLE LEAF FIBRE REINFORCED POLYPROPYLENE COMPOSITES A STUDY OF ROUNDABOUT - MODE OF OPERATION AND PERFORMANCE THE USE OF ENCASED TIMBER AS ALTERNATIVE TO REINFORCED CONCRETE COLUMNS DESIGN, CONSTRUCTION AND TESTING OF AN OUTWARD RADIAL-FLOW REACTION WATER TURBINE DEVELOPMENT OF A SENSITIVITY INDEX BASED TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER PLACEMENT WITH CONTINGENCY ANALYSIS ON NIGERIA 330kV TRANSMISSION NETWORK STEPPED SPILLWAY MODEL INVESTIGATIVE STUDY DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF AN AXIAL-FLOW MILLET THRESHER A STUDY OF THE DEPHOSPHORIZATION OF KOTON KARFE IRON ORE BY ACIDIC LEACHING SEASONAL VARIATION OF MOBILE RADIO PROPAGATION CHARACTERISTICS IN KADUNA METROPOLIS AND ENVIRONS QUEUE MODELLING AND APPLICATIONS AT THE KADUNA TOLL BOOTHS ELIMINATING SPEED CONSTRAINTS ALONG KADUNA-ZARIA RAILWAY LINK

click on whatsapp