Site Logo E-PROJECTTOPICS

EVALUATING SERVICE DELIVERY PERFORMANCE OF WATER UTILITIES IN KADUNA STATE WATER BOARD

(A CASE STUDY OF NIGERIA)


📝


Presented To


Engineering Department

📄 Pages: 93       🧠 Words: 9956       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 257      

⬇️ Download (Complete Report) Now!

ABSTRACT
This study assesses the operational management and efficiency of water supply schemes in Kaduna State using a performance indicator called "Service Standard Performance Metrics (SPEM)"and SWOT analysis. The three water treatment plants in Kaduna metropolis were visited. Detailed evaluations were carried out for the schemes using some aspects of technical, financial, human resources and institutional performance indicators. The benchmarking approach was used for the evaluation of the service delivery performance and the results obtained for the performance were compared with other developed countries. The results clearly show that unaccounted for water, billing efficiency and cash operating ratio are still the major problem of these schemes. Averagely, the service coverage for the entire state is 27%, which is very low and the average service coverage for the Kaduna metropolis is 71%. The average unaccounted for water for the entire state is 47% and 52% for the three schemes in the Kaduna metropolis. This indicates that more than 40% of the water treated is being lost either through illegal connection or through pipe burst. The duration of supply is less than 24hrs. The cost recovery for the metropolis is 22% at N21/m3 as against production cost of N93.50/m3. Involvement of the private sector participation was suggested in the study for effective performance of the service delivery.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 93       🧠 Words: 9956       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 257      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATION OF WATER ADVANCE MODELS FOR FURROW IRRIGATION SYSTEM EVALUATION OF THE FACTORS AFFECTING THE SELF-PURIFICATION CAPACITY OF RIVER KADUNA, NIGERIA ASSESSMENT OF GROUNDWATER POTENTIAL ZONES IN OKEERO LGA OF KWARA STATE NIGERIA USING GIS-BASED INTEGRATED APPROACH IMPROVED DESIGN AND PERFORMANCE ANALYSIS OF SIMILAR POLE RATIO DUAL STATOR WINDINGS FOR SIX PHASE INDUCTION MACHINES DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF A FIXED BED PYROLYSIS SYSTEM DEVELOPMENT AND OPTIMIZATION OF THE THRESHING PERFORMANCE OF A MULTICROP THRESHER DEVELOPMENT AND PERFORMANCE EVALUATION OF GOVERNOR CONTROL APPARATUS ESTIMATION OF WATER EROSION OF A NIGERIAN GUINEA SAVANNA SOIL DEVELOPMENT AND PERFORMANCE EVALUATION OF A FOUR ROW ANIMAL DRAWN MAIZE SEED PRECISION PLANTER YIELD AND WATER USE RESPONSE OF WATERMELON UNDER DEFICIT IRRIGATION AND MULCH SIMULATION, DEVELOPMENT AND PERFORMANCE EVALUATION OF A SOLAR/GAS HYBRID POWERED ABSORPTION AIR – CONDITIONING SYSTEM EFFECT OF MIX RATIO AND CURING WATER ON THE COMPRESSIVE STRENGTH OF OIL PALM SHELL (OPS) AGGREGATE CONCRETE DYNAMICS OF WATER COMPOSITION IN THE SOUTH-EASTERN (SOKOTO) SECTOR OF IULLEMMEDEN BASIN, NIGERIA, USING ISOTOPEAND HYDRO-CHEMICAL TECHNIQUES DESIGN, DEVELOPMENT AND PERFORMANCE EVALUATION OF A MULTIPLE SANDCRETE BLOCKS MOULDING MACHINE IMPROVEMENT OF THE PERFORMANCE OF AN EXISTING FATLIQUOR PILOT PLANT ECONOMIC ANALYSIS OF ARTISANAL FISH MARKETING IN KEBBI STATE OF NIGERIA STUDIES OF DISINFECTION BY-PRODUCTS AND HEAVY METALS IN AHMADU BELLO UNIVERSITY DRINKING WATER SUPPLIES AND OPERATIONS OF SOME TREATMENT PLANTS DEVELOPMENT OF EUCALPYTUS TERETICORNIS COMPOSITE (BARKS AND LEAVES) ADSORBENT FOR ADSORPTION OF CHROMIUM (VI) AND LEAD (II) IONS FROM SIMULATED WASTEWATER CLIMATE VARIABILITY AND ITS IMPACT ON WATER RESOURCES OF LOWER KADUNA RIVER CATCHMENT NIGERIA IRRIGATION WATER FROM SMALL SCALE EXCAVATIONS IN A DRY RIVER BED

click on whatsapp