Site Logo E-PROJECTTOPICS

RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS


📝


Presented To


Environmental Design Department

📄 Pages: 81       🧠 Words: 9274       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 122      

⬇️ Download (Complete Report) Now!

ABSTRACT
This research work deals with the investigation of the reliability or otherwise of the engineer's estimate in selective tendering for building works. The term 'engineer's estimate' as used in this work means the estimated cost of a building normally prepared for the client by his construction cost consultants just before or during tender period,based on the same tender documents given to selected tenderers. In this work, the bills of quantities forms part of the tender documentation. This estimate is also referred to as comparative or pre-tender or QS estimate. The investigation is limited to pre-contract stages of the building process. As a result of this, the investigation dealt mainly with the question of how reliable the engineers estimate is to the client, in terms of getting responsible tenders and awarding the contract within not more than +10 percent difference from the engineers estimated cost. It has been discovered during the investigation that clients rely heavily on the engineers estimate to the extent that for a contractor to win a contract for building works, his tender should not differ by more than +10 percent of the engineers or QS estimate. In addition to this, it has also been discovered that strict reliance on the engineers estimate, especially in cases where the trend of tenders reveal otherwise, might result in unpleasant post contract problems such as escalation of costs and possible delay or abandonment of the project. This is because the engineers estimate is not 100 percent reliable. As such, in cases where majority of tenders received differ very significantly from the engineers estimate, then the accuracy or otherwise of the engineers estimate should be looked into. Recommendations on how to improve the reliability of the engineers estimate are proposed in the conclusions. In general, this work has helped to bring out some problems in tendering as well as preparation of tender documents and pricing. It is hoped that the result of this research will be of immense benefit to the Government, various members of the Construction Industry and the general public.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 81       🧠 Words: 9274       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 122      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATING THE EFFECTS OF BUILDING FORMS ON THERMAL COMFORT IN OFFICE BUILDINGS IN HOT HUMID AREAS AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS An Investigation into the conditions of contract with regards to claims in some selected building projects EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVISION OF BUILDING SERVICES IN MULTI-STOREY BUILDINGS MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA APPLICATION OF BIOCLIMATIC PRINCIPLES TO REDUCE ENERGY CONSUMPTION IN THE DESIGN OF SENATE BUILDING FOR NASARAWA STATE UNIVERSITY ENHANCING PASSIVE COOLING IN HEALTHCARE BUILDINGS USING COURTYARD FORMS IN THE DESIGN OF WOMEN AND CHILDREN HOSPITAL IN KADUNA STATE, NIGERIA ASSESSMENT OF HUMAN RESOURCE MANAGEMENT PRACTICES OF BUILDING CONSTRUCTION FIRMS AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA EVALUATING PASSIVE COOLING STRATEGIES FOR ENERGY EFFICIENCY IN THE DESIGN OF SENATE BUILDING FOR FEDERAL UNIVERSITY KASHERE, GOMBE STATE DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS BUILDING FAILURES PROPOSAL FOR PRIVATE AIRLINES TERMINAL BUILDING MURTALA MOHAMMED AIRPORT LAGOS AN APPRAISAL OF PREQUALIFICATION CRITERIA USED FOR CONTRACTORS SELECTION IN PUBLIC BUILDING PROJECTS IN NIGERIA REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING CONTROL OF LABOUR COSTS IN BUILDINGS A SURVEY OF VISUAL AIDS DESIGN, PRODUCTION, USAGE AND EVALUATION IN ENHANCING TRAINING AND CAPACITY BUILDING

click on whatsapp