Site Logo E-PROJECTTOPICS

PATTERN AND URBAN MANAGEMENT CHALLENGES OF DEVELOPMENT CONTROL VIOLATIONS

(A CASE STUDY OF WUSE DISTRICT F.C.C ABUJA)


📝


Presented To


Environmental Design Department

📄 Pages: 80       🧠 Words: 7488       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 146      

⬇️ Download (Complete Report) Now!

ABSTRACT
This thesis examines the pattern and urban management challenges of Development Control Violations in Wuse District of Federal Capital city of Abuja. Its primary scope is on the level of compliance to Development Control standards for residential plots in the study area with reference to Land Use, Density, setback, building and fence height. The study identified 2,763 residential plots allocated in Wuse I and II out of which 21% (574 plots) were picked as sample for detail analysis in the study. The results from the analysis indicates that violation of land use by contravention from residential to other uses constitutes the highest form of violation of development control standards in the study area with 238 cases (42%), set back was identified to be second with 161 cases (28%), density/building height violation constitutes 151 cases (26%); while fence height violation was found to be the least with 24 cases (4%) of the total development control violations studied. Challenges established from the study include traffic congestion, inefficient service delivery (e.g. water, electricity and sewage), and poor visual quality or aesthetics. Recommendations made include; review of the Abuja Master Plan, Urban upgrading and renewal, accelerated infrastructural development of phase II and III, effective traffic management, autonomy of the Development Control Department, review of the land use change approval process and development control guidelines, and the strengthening of the development control department. In conclusion, the study raised issues of concern to urban planners and managers which indicate the need for a framework for creating a practicable and livable habitat in our cities through ensuring synergy with all relevant stakeholders and institutions involved in city building for sustainable development.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 80       🧠 Words: 7488       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 146      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

RESTORATION AS STRATEGY FOR KANO CITY DEVELOPMENT: ANCIENT KANO CITY RELICS AND MONUMENTS EVALUATION OF PERFORMANCE OF SOLID WASTE MANAGEMENT SERVICE PROVIDERS EXPLORATION OF SELECTED FROGS' COLOUR PATTERNS IN PAINTING KADA LODGE - A COMPLEMENTARY DEVELOPMENT FOR HASSAN KATS1NA MEMORIAL PARK, KADUNA DEVELOPMENT OF A POST-OCCUPANCY EVALUATION TOOLKIT FOR STUDENT HOSTEL AN APPRAISAL OF URBAN GOVERNANCE PRACTICES AND THE DEVELOPMENT OF INFORMAL ECONOMIC ACTIVITIES IN ZARIA URBAN MANAGEMENT CHALLENGES FOR WATER SUPPLY IN PERIPHERAL SETTLEMENTS ASSESSMENT OF THE COMMERCIALIZATION PROGRAMME OF SOLID WASTE MANAGEMENT MUNICIPAL SOLID WASTE MANAGEMENT TECHNIQUES SOME ASPECTS OF URBAN DESIGN DEVELOPMENT OF AN INDIGENOUS CERAMICS BEAD MODEL CLAY FOR PLAY TO ENHANCE LEARNING OF CHILDREN WITH LEARNING DISABILITIES ASSESSMENT OF URBAN BUS SERVICES IN MINNA NIGER STATE REDEVELOPMENT OF TELEVISION VILLAGE BUS TERMINAL (AN ARCHITECTURAL REDEVELOPMENT PROPOSAL TO NEW TRENDS IN SOCIO-ECONOMIC DEVELOPMENT) DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY ANALYSIS OF THE ENVIRONMENTAL SUSTAINABILITY OF TOURISM INFRASTRUCTURE DEVELOPMENT AT YANKARI GAME RESERVE AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA THE IMPLEMENTATION OF THE MASTER PLAN FOR THE FEDERAL CAPITAL CITY, ABUJA: A Review of the problems of Development Control ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA PARTNERSHIP FRAME-WORK FOR THE PROVISION AND MANAGEMENT OF URBAN INFRASTRUCTURE IN ABUJA CITY KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL

click on whatsapp