MODELING DURATION OF BUILDING RENOVATION PROJECTS


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 95       🧠 Words: 8815       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 106      

⬇️ Download (Complete Report) Now!

ABSTRACT
Accurate estimation of construction time has been identified as a major problem to the construction industry at large, several efforts have being made to develop models to predict duration of construction projects, researchers argued that development of models to predict duration of renovation projects is in its preliminary stage and went on to develop a model to predict duration of renovation projects. Existing models are scope based model and researchers have questioned the accuracy of scope based models as they do not include other non-scope factors which affect duration of projects. This study is aimed at developing a model which incorporate both scope and non-scope factors in predicting duration of building renovation projects. To achieve this aim, non-scope factors as well as project scope factors with good predictive abilities were firstly, identified from literature. A questionnaire survey was then used to obtain from construction firms; basic data/information relating to the identified project scope factors as well as data/information relating to impact of the non-scope factors on duration of building renovation projects. Out of a computed sample size of 357 TETfund building renovation projects, data relating to 121 completed TETfund building renovation projects were provided by the construction firms. Descriptive statistics was used to gain an overview of data obtained from the questionnaire survey, the study revealed that the most significant factors that affect duration of building renovation projects are variations, incomplete scope of work, material delivery, scarcity of materials, labour productivity, and owner financial capacity are the top five factors that influence duration of renovation projects. inferential statistics was used to determine the variance in duration of different categories of renovation projects and the ANOVA shows that statistical significant difference exist in duration of different types of renovation projects. 90% of the data was used to develop an artificial neutral network models on SPSS25. MAPE and T-Test were used to validate the models. 8 Artificia Nuera Network models were developed one multilayer perceptron (MLP) and radial basis function (RBF) model for each category. The accuracy of the models are 86%, 80%, 90%, 87%, 91%, 87%, 98%, 96% in this other; MLP(General), RBF(General), MLP(Block of offices and classroom), RBF(Block of offices and classrooms), MLP(Library), RBF(Library), MLP(Theatre), RBF(Theatre). The developed models will help project managers to accurately predict the duration of building renovation projects.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 95       🧠 Words: 8815       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 106      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

AN APPRAISAL OF CONVERSION PROCESS OF BUILDINGSIN TERTIARY INSTITUTIONS APPRAISAL OF STAKEHOLDER MANAGEMENT PRACTICE IN TERTIARY EDUCATION TRUST FUND (TETFUND) CONSTRUCTION PROJECTS CONTROL OF LABOUR COSTS IN BUILDINGS FINANCING URBAN INFRASTRUCTURE DEVELOPMENT PROJECTS : AN ANALYSIS OF THE STRATEGIES USED IN KADUNA AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS PROPOSAL FOR PRIVATE AIRLINES TERMINAL BUILDING MURTALA MOHAMMED AIRPORT LAGOS REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING Assessment of the Impact of Contraventions of Building Regulations on the Architecture of Mixed Landuse Areas of Kano Metropolis AN EVALUATION OF DISASTER PREPAREDNESS IN INDUSTRIAL BUILDINGS COMMUNITY BUILDINGS COMPLEX SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA AN EVALUATION OF CONTRIBUTION OF COST CONTINGENCY TOWARDS SUCCESSFUL EXECUTION OF BUILDING PROJECTS IN NIGERIA EVALUATING PASSIVE COOLING STRATEGIES FOR ENERGY EFFICIENCY IN THE DESIGN OF SENATE BUILDING FOR FEDERAL UNIVERSITY KASHERE, GOMBE STATE LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE) AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA USER REQUIREMENTS IN THE DESIGN OF MULTI-STOREY RESIDENTIAL BUILDINGS AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA PERCEPTION OF CONSTRUCTION PROFESSIONALS ON ATTRIBUTES OF PROJECT SPONSORS AND CONCESSIONAIRES OF PUBLIC PRIVATE PARTNERSHIP PROJECTS

click on whatsapp