Site Logo E-PROJECTTOPICS

PERCEPTION OF CONSTRUCTION PROFESSIONALS ON ATTRIBUTES OF PROJECT SPONSORS AND CONCESSIONAIRES OF PUBLIC PRIVATE PARTNERSHIP PROJECTS

(A CASE STUDY OF NIGERIA)


📝


Presented To


Environmental Design Department

📄 Pages: 97       🧠 Words: 11286       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 103      

⬇️ Download (Complete Report) Now!

ABSTRACT
Public private partnership (PPP) is a rapidly growing means of procuring infrastructure asset and their associated services. This research focused on the challenges encountered during the tendering and negotiation phase of the PPP project procurement. The aim of the study is to assess the perception of construction professionals on the attributes affecting contract negotiation of Project Sponsors and concessionaires of PPP projects in Nigeria. Following the identification of the attributes affecting contract negotiation of PPP from literature, a questionnaire survey was developed and the responses obtained were used to assess the perception of Nigerian construction professionals having some PPP experience on the relative significance of the project sponsors and concessionaires attributes based on five-point Likert rating scale from 1 "insignificant" to 5 "extremely significant", statistical analysis using SPSS 20th edition was carried on the data generated. The result showed that; appointing a dedicated bid manager, robustness of outline technical proposal, level of financial guarantees provided/proposed by the concessionaires, level of reputation enjoyed by the organization, ability to effectively establish the project parameters and ability to offer tax concession or flexible tax regime are the most influencing attributes that have significant bearing on the efficiency of pre-contract processes. Whilst there was broad agreement on the ranking of importance for the various descriptive attributes, differences between the sectors are revealed relating to organizational nature and strength, organizational capabilities, technical capabilities and financial capabilities of the parties. This implies that these attributes may serve as a good baseline to both project sponsors and concessionaire in the negotiation of PPP projects which in effect may reduce the xii misunderstanding that arise during the tendering and negotiation processes. The study concludes that a better understanding of what is important to each party in the negotiation is an important step in improving the PPP process.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 97       🧠 Words: 11286       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 103      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

APPRAISAL OF SANITARY FACILITIES IN PUBLIC AREAS OF GARKI DISTRICT EVALUATING LESSONS LEARNED PRACTICES (LLPs) IN PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS IN NIGERIA ASSESSMENT OF QUALITY OF CONSTRUCTION WORK IN MASS HOUSING PROJECT WITH MULTIPLE CONTRACTORS WORLD BANK INFRASTRUCTURE DEVELOPMENT FUND (IDF) PROGRAMME: AN ANALYSIS OF THE SUSTAINABILITY OF YOLA-JIMETA PROJECT UNRRODUCTIVE COSTS IN BUILDING PROJECTS AN ASSESSMENT OF THE VISUAL COMMUNICATIONS APPROACH OF THE PUBLICATION UNIT OF AHMADU BELLO UNIVERSITY, ZARIA-NIGERIA NIGER STATE CERAMIC PROJECTS DEVELOPING FACTOR-BASED MODELS FOR MEASURING AND PREDICTING HAZARD RECOGNITION CAPABILITY OF CONSTRUCTIONWORKERS FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS AN APPRAISAL OF THE READINESS OF NIGERIAN BUILDING CONSULTING FIRMS TO ADOPT LEAN CONSTRUCTION PRINCIPLES AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS THE EFFECTS OFPRODUCTIVITYAND WORK FLOW VARIABILITY ON CONSTRUCTION JOBSITE LABOUR PERFORMANCE IN NIGERIA FINANCING URBAN INFRASTRUCTURE DEVELOPMENT PROJECTS : AN ANALYSIS OF THE STRATEGIES USED IN KADUNA EVALUATING USER NEEDS IN THE DESIGN OF PUBLIC LIBRARY, KADUNA: INTEGRATING CYBER COMMUNITY EVALUATION OF THE EFFECTIVENESS OF HEALTH AND SAFETY TRAINING PRACTICES OF CONSTRUCTION FIRMS PARTNERSHIP FRAME-WORK FOR THE PROVISION AND MANAGEMENT OF URBAN INFRASTRUCTURE IN ABUJA CITY ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA AN APPRAISAL OF PREQUALIFICATION CRITERIA USED FOR CONTRACTORS SELECTION IN PUBLIC BUILDING PROJECTS IN NIGERIA

click on whatsapp