Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 80       🧠 Words: 9666       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 109      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 80       🧠 Words: 9666       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 109      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

AN ASSESSMENT OF THE ENTREPRENEURIAL SKILLS OF QUANTITY SURVEYING CONSULTANTS ASSESSMENT OF PROFESSIONAL'S PERCEPTION OF KNOWLEDGE AND SKILLS REQUIREMENT OF CONTRACTORS FOR MASS HOUSING CONSTRUCTION ESTIMATES AS A TOOL FOR BUILDING PROJECT COST CONTROL ASSESSMENT OF SOME INDICES OF PROFESSIONALISM IN THE NIGERIAN CONSTRUCTION INDUSTRY DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA AN ASSESSMENT OF SITE LAYOUT PRACTICES OF SOME CONSTRUCTION FIRMS AN APPRAISAL OF ATYAP PERFORMING ARTS OF ZANGON KATAF KADUNA STATE, NIGERIA (1950 – 2013) BUILDING FAILURES An Investigation into the conditions of contract with regards to claims in some selected building projects AN ASSESSMENT OF JOS PLATEAU VOLCANIC DEPOSITS AS POZZOLANS AND ITS EFFECT ON BLENDED ORDINARY PORTLAND CEMENT CONCRETE MAPPING AND ANALYSIS OF SITES FOR GRAZING RESERVES IN SOME STATES OF NORTHERN NIGERIA ABUJA INTERNATIONAL TRADE FAIR COMPLEX AN APPRAISAL OF PHYSICAL INFRASTRUCTURES IN TRADE FAIR CENTRES IN NIGERIA AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA THERMAL ZONING PRINCIPLE FOR ENERGY EFFICIENCY IN THE DESIGN OF INDOOR FITNESS AND SPORT CENTRE, WARRI NIGERIA CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY AN APPRAISAL OF PREQUALIFICATION CRITERIA USED FOR CONTRACTORS SELECTION IN PUBLIC BUILDING PROJECTS IN NIGERIA AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS USE OF CULTURAL ELEMENTS AS SOURCES OF FORMS IN THE DESIGN OF CULTURAL CENTRE RELATIONSHIP BETWEEN CONTINUOUS ASSESSMENT SCORES AND PERFORMANCE IN ART EVALUATING THE INFLUENCE OF ARCHITECTURAL CHARACTER ON INMATES IN THE DESIGN OF PRISONS IN NIGERIA

click on whatsapp