AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 80       🧠 Words: 9666       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 224      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 80       🧠 Words: 9666       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 224      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF THE IMPLEMENTATION OF BWARI MASTER EXPLORING BUILDING ENVELOPE DESIGN FOR WARM HUMID ZONES TO OPTIMIZE INDOOR THERMAL COMFORT IN THE DESIGN OF A PROPOSED LEKKI FREE TRADE ZONE RESORT, LAGOS ASSESSMENT OF GRAPHIC DESIGN CURRICULAR OF NIGERIAN UNIVERSITIES IN RELATION TO DIGITAL CHALLENGES FACED BY FRESH GRADUATES IN THE PRINTING INDUSTRY AN APPRAISAL OF ATYAP PERFORMING ARTS OF ZANGON KATAF KADUNA STATE, NIGERIA (1950 – 2013) CREDIT FACILITIES IN THE FINANCIAL INSTITUTIONS FOR FINANCING CONSTRUCTION PROJECTS IN NIGERIA PROPOSAL FOR PRIVATE AIRLINES TERMINAL BUILDING MURTALA MOHAMMED AIRPORT LAGOS ASSESSMENT OF THE ACTIVITIES OF ABUJA GEOGRAPHIC INFORMATION SYSTEM (AGIS) EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES PLANNING, DECISION MAKING AND PUBLIC PARTICIPATION IN HOUSING PROGRAMMES IN NIGERIA AN APPRAISAL OF CONVERSION PROCESS OF BUILDINGSIN TERTIARY INSTITUTIONS ASSESSMENT OF MOTIVATION OF NON-CONSTRUCTION PROFESSIONALS IN CONSTRUCTION COMPANIES AN ASSESSMENT OF BIOCLIMATIC DESIGN PRINCIPLES IN OPTIMISING ENERGY EFFICIENCY IN DESIGN OF STATE CONVENTION CENTER MAPPING AND ANALYSIS OF SITES FOR GRAZING RESERVES IN SOME STATES OF NORTHERN NIGERIA MODIFICATION OF NIGERIAN TRADITIONAL MEN’S HORIZONTAL LOOM TO ENHANCE PRODUCTIVITY OF THE NARROW BAND FABRIC DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY FORMULATION OF SOME HIGH-FIRED PORCELANOUS THROWING BODIES AND GLAZE FIT: AKWANGA LOCAL GOVERNMENT AREA - RESOURCES NIGERIAN ASSOCIATION OF CHAMBERS OF COMMERCE, INDUSTRY, MINES AND AGRICULTURE HEADQUARTERS, ABUJA COMMUNITY BUILDINGS COMPLEX PERFORMANCE EVALUATION OF THE IMPLEMENTATION OF THE FEDERAL GOVERNMENT SITES AND SERVICES PROGRAMME IN NIGERIA AN ASSESSMENT OF THE SUITABILITY OF IBETO CLAY IN NIGER STATE FOR THE PRODUCTION OF TABLEWARE

click on whatsapp